Find what's fragile.
Before it kills
your system.

The De-Risk Audit maps every weak point in your nuclear or advanced energy test system - hardware, signals, data, safety logic - delivered in writing over 5 consecutive days of service.

0d
of delivery
100%
written findings
100%
confidential
3+
nuclear facilities

FRAGILE

Right now, one person knows how it's wired.

When they leave, your setup becomes a mystery.

SCROLL
00 / 02
The Problem

Why choose us.

Somewhere you haven't looked yet. These are the three failure patterns we find in every test system that hasn't been audited.

01
If your system fails mid-run, does it recover gracefully - or do you lose the entire experiment?
We eliminate unpredictable system behavior. By mapping every possible failure state, we replace chaos with a clear, automated path to a safe and recoverable alternative.
02
Your software is down, the GUI is frozen. Is your emergency shutdown still operational?
If your safety path relies on an OS, your asset is vulnerable. We audit your dependencies to ensure your critical protection chain remains operational, even when your computer completely freezes.
03
Could your system survive a surprise regulatory audit tomorrow?
Saying a system is safe isn't enough; you need a verifiable evidence chain. We pressure-test your safety functions and evaluate your architecture so you can hand over defensible proof before an auditor ever asks for it.
The Process

How we
work.

Three steps from your current setup to a complete written risk map - with specific, actionable fixes.

Share Your Setup
Send block diagrams, photos, and a software overview. No lengthy intake forms. A 30-minute call is optional - we work from what you have.
5-Days of Delivery
We evaluate every layer: signal chains, safety logic, firmware behavior, calibration traceability, data integrity, software, and operator workflow. Nothing is assumed to be fine until it is confirmed.
Receive Your Risk Map
A written report: every fragile point documented, ranked by severity, with specific fix recommendations and effort estimates. Plus a 1-hour review call.
The Solution

The De-Risk Audit

A focused technical review of your test system - delivered in writing over 5 consecutive days of service.

WHAT YOU RECEIVE

Written Findings Report
Risks and fragile points identified, described, and prioritized
Priority-Ranked Issue List
Ranked by severity and impact on test outcomes
Improvement Recommendations
Specific to your system, not a generic checklist
Indicative Effort per Finding
Understand the scope of each finding before you act
1-Hour Review Call
Walk through findings, answer every implementation question

Written. Ranked. Done.

Key risks documented with findings and improvement recommendations. No observations that go nowhere. If your system is already sound, the audit confirms it in writing.

Delivered in 5 consecutive days of service

Starts the day you submit. Ends with a written report in your inbox.

ADD-ONOn-site evaluation available

Some systems are better assessed in person. On-site visits covering hardware, wiring, and live behavior are available as an add-on to the written audit.

Real Environments

Built inside
nuclear facilities.

Not theoretical. Not simulated. Every methodology comes from operating real systems inside operating nuclear research environments.

Jožef Stefan Institute F8
Ljubljana, Slovenia
TRIGA MARK II reactor. Neutron physics instrumentation, irradiation pod control, automated DAQ.
ITER Organization
Cadarache, France
World's largest fusion project. Instrumentation under stringent nuclear qualification requirements.
CEA Cadarache
France
French Atomic Energy Commission. Measurement systems with nuclear-grade signal integrity.
Delivered Systems

The systems,
when they're done.

Live GUI demos - operator interfaces built for real nuclear test environments.

 LIVE DEMO  ·  n/γ PULSE-SHAPE DISCRIMINATOR  ·  EJ-301 LIQUID SCINTILLATOR
NUCLEOSENSE DPP v2.1  ·  R4144 PMT  ·  CHANNEL 3  ·  250 MSa/s
● ACQUIRING
EJ-301 · Gate 35 / 200 ns · Disc. level PSD = 0.240 · FOM ≈ 1.21 → Open full demo
Get Started

Ready to find out
what's fragile?

5 consecutive days to a written risk map, ranked by severity. If your system is already airtight, you'll know exactly why.

Please provide an email or a phone number so we can reach you.

Message sent.

I'll review your details and follow up within 24 hours.